The right and center lanes of eastbound Washtenaw Avenue should re-open sometime Friday, as repairs are made to a sinkhole caused by failure of a storm water line.
The city of Ypsilanti assisted M-DOT with the repairs Tuesday. M-DOT says concrete will be poured Wednesday, and the road should be back to three lanes of traffic on Friday.